Channel

Duwamish River at 14th St. Bridge. These pilings, I believe, were put in place to guide the large ships through the narrow passage of the drawbridge. Right now construction of the new bridge is progressing. They are building the cofferdams for the new bridge using the large crane seen in a previous post.

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.